Tasks accomplished for the week:


  • More detailed prototype screens developed for first cognitive walkthrough  - 1 hour each - Full team
  • Review of results from cognitive walkthrough - 1 hour - full team.
Notes:
On-screen keyboard layout needs modification
Color selection tool debates- perhaps a simple&advanced mode?
Moving 'corner icons' to a toolbar at the bottom instead
A new two-level 'tools' menu, first select tool, then size of the tool
Elevation of 'undo' to its own button
Make sure Help screens do not require scrolling
Remembering last entered email address until session ends

  • Assignment of detailed prototype screens for Assignment 2 - .25 hours - Full team
  • Blog Posting .5 - Rob
  • Research of KidPix software - 0.25 hours - Full team

Tasks to focus on next week:
  • Work on design document for project using the provided template - 3 hours - Full team
  • High fidelity versions of prototype screens finished in Flex - Full team - 4 hours each
Tasks being covered in prototype screens for deliverable 2:
1. Welcome Screen + Basic Drawing with Brush 
2. Color selection + Basic Drawing 
3. Email screen
4. Help screen

Challenges and Issues:

  • Balancing flexibility of tools given to user with the desire for simplicity
  • Icon design for showing multiple sub-functions

Monday, March 30, 2009

Radial UI for Corner Buttons

Alternative UI Discussion

With our decision to use buttons extending from the corners, we have come to a dilemma as how the canvas size should be handled.

In the example UI above, we have our corner buttons in black, with the sample canvas size in grey. In a possible full canvas, you can draw behind the buttons, which is disconcerting to the user and hides a portion of the drawing. In a possible small canvas, you could shrink the canvas size, but would minimize the impact of the corner buttons, since they would not be in the corners... We are unsure how to proceed and are leaving any options open to discussion.

Saturday, March 28, 2009

End of Week 3

Tasks accomplished for the week:

  • Worked on SRS - 5 hours - Full team
    • Summary
    • Users
    • Use Cases
    • Usability Requirements
    • HTAs
    • Prototype screens
  • User classes and layout brainstorming - 1 hour - Full team
  • Splitting up project for prototype implementation - .5 hour - Full team
  • Exploration of Flex capabilities and limitations - 2 hours - Full team
  • Created working 'flex image -> email' web service using PHP - 5 hours, Rob
  • Performance enhancements in prototype drawing code - 1 hour, Rob
  • Create icons for the GUI - 2 hours - Dan
  • Create working on screen keyboard for the email screen - 2 hours - Dan
  • Blog Posting .5 - Rob
Tasks to focus on next week:

  • Integration of 'email' and 'drawing' screens in functional prototype (evolutionary) ~ 2 hours - Matt B
  • Preparation for cognitive walkthrough ~ 1 hour - Full team
  • Begin a concise Design document for project using the provided template ~ 2 hours - Full team
  • User session implementation ~ 2 hours - Rob

Challenges and Issues:

  • Matching HTA's to a common style for the SRS
  • Defining how to best present the capabilities to a new user. One good idea that developed was to explicitly ask the user if they had used the program before.

Monday, March 23, 2009

New prototype layout

Possible layout for our main UI with expandable menus from the corners.
From class on 03-23-09.

Friday, March 20, 2009

End of Week 2

Tasks accomplished for the week:
  • Project proposals developed through meetings, emails, and chat sessions - 3 hours - Full team
  • Painting project brainstorming on interface options and possible end users - 1 hour - Full team
  • HTA for Painting, Erasing, Color Picker, and Emailing - 1 hour - Full team
  • Blog setup & postings - 0.5 hours - Rob and Dan
  • Wiimote connection research - 2 hours - Rob and Dan
  • SVN Repository setup at assembla.com - 0.5 hours - Rob
  • Learned and practiced Flex - 3 hours - Rob
  • Figured out how to change color picker properties - 1 hour - Dan
Tasks to focus on next week:
  • Develop SRS - ~4 hours - Full team
  • Split up project for prototype implementation - ~1 hour - Full team
  • Exploration of Flex capabilities and limitations - ~2 hours - Full team
  • Test PHP (or similar) mail server interaction with Flex - ~2 hours - Rob and Matt B
  • Create icons for the GUI - ~2 hours - Dan
Challenges and Issues
  • Wiimote bluetooth connection requires specific driver packages, can BSOD XP in vmware.

Monday, March 16, 2009

Prototype Interface 0.01alpha



Here it is our first interface prototype in all its glory.